Showing posts with label trains. Show all posts
Showing posts with label trains. Show all posts

Crofton Park Trains All Messed Up. Bibbidi bobbidi boo.

"Well, serves you right, spoiling people’s best dreams."
- Cinderella

Until now, the Cinderella Line group, which campaigns for a better Crofton Park service, has operated in a parallel universe, where people just ask for things and public transport organisations deliver them promptly and efficiently.

Now, thanks to massive disruption on the Thameslink line, they have rejoined the rest of us in the real world. They write regarding the ongoing problems passengers are experiencing:

The message we have been feeding back to Thameslink, based on our experience is that this is simply unacceptable and cannot continue.

As always, it's the pressure from all our supporters that allow us to keep holding Thameslink to task so please continue to stand with us so we can do this. Our MP Vicky Foxcroft has already been in touch with Thameslink.

Why do services keep getting cancelled?

The national timetable planning process across the entire national rail network has been significantly delayed. Railway timetables are normally published 12 weeks in advance, however, rewriting the timetable from scratch across such a huge network is a massive undertaking and was not completed until a few weeks ago.

In addition to running passenger services, the timetable changes define the scope of engineering work to the track. This, in turn, affects the deployment of trains and train crew and the access they have to train maintenance depots. Less time than usual has been available to re-plan the driver allocations as well as the train stabling and maintenance requirements.

On top of all of this, there simply arent enough drivers trained to drive all of the new routes. Train drivers can’t simply turn up and drive any train – they need to understand and be cleared for, the routes that they drive.

We anticipate that it will get better as time goes on, however right now, Thameslink have been unwilling or unable to confirm how long this disruption might last so check before travelling and have a plan B.

Why are some of our services back to 4 carriages after being told they would always be 8 carriages?

Due to the implementation of the new timetables, SouthEastern have been drafted in by Thameslink to run some of our services on a temporary basis.

SouthEastern use older trains that can be split in two, and as they have a shortage of trains on their own network it means that some of our services may run short.

Why aren't there any more fast services from Catford? Our journey times have now increased for some services?

On the Cinderella Line, there is limited capacity for our Thameslink passenger services to run. The only way for us to have more services overall is for all our trains to stop at all stations, so they move in unison – exactly like they do on the tube.

Since Thameslink either can't or won't be clear about how long we might have to endure the current issues, thinking up alternative routes and checking before you travel are about the only things we can do.

For the full horror, click here.

New timetable and more trains for Crofton Park

New trains come into service soon
A completely new timetable will apply to Crofton Park trains from Sunday, May 20th.

And since there is nothing harder and more confusing than trying to write about train timetables for a service you don't use, the Cinderella Line campaign for better rail services through Crofton Park has summarised it instead. They say:

Thanks to everyone, from 21st May we will be enjoying our well-deserved 4 trains an hour on the Cinderella Line, doubling current capacity and giving us vital new services across London.

Here are the key changes:

Our core service

4 trains an hour all day every day Monday – Saturday. Sunday will initially have 2 trains an hour increasing to 4 once Network Rail have completed some engineering works that will allow Thameslink to run the full service on Sundays too.

You can read more about the engineering works here.

Two of our services will terminate at Blackfriars and two will go beyond to Kentish Town, linking us up to Farringdon for Crossrail and Kings Cross St Pancras.

Weekday mornings into London

On weekday mornings we will have 4 trains an hour and Crofton Park and Bellingham will also have some direct services to London Victoria:

The 4 Thameslink services will be spaced at 10 and 20 minute gaps. This is to pave the way for eventually increasing our service to 6 trains an hour and we're going to be pushing for this to happen.

Just imagine: a train every 10 minutes!

But there is a catch if you want to go to Victoria

From Crofton Park there are currently three direct services to London Victoria on weekday mornings departing at 7:36, 8:23 and 8:43. In the new timetable from May, these times have been amended to depart at 7:46, 8:15 and 9:21, so our third service will be more than 30 minutes after it currently is.

We have raised this with Southeastern Railway and the reason for this is that under the new timetable with all of our core services through Blackfriars, it is not currently possible to have a train that stops at Crofton Park at around 8:45 to Victoria as this could cause a knock-on delay to other services.

And the new services won't be fully operational straight away

From 11th June the initial phasing will be complete and our services will run as planned. During the phasing in period, some of our services will either start from Blackfriars or Terminate there, but after 11th June they will run the full length of the route.

For the full rundown of changes, click here.

You shall go to the ball, four times an hour

The Cinderella Line campaign to improve train services through Crofton Park station will be celebrating a major victory from May, as frequency of service will be increased to four trains per hour during off-peak periods. They explain:

Despite a week of snow, nearly 100 local residents braved the weather and made it to the Rivoli Ballroom on Saturday to hear about the future of rail services at Crofton Park. For those who couldn't face the cold, or who made it but want to hear about it all over again, here are the highlights:

Local MP Vicky Foxcroft made the introductions and Michael from the Cinderella Line campaign talked about the achievements of the last few months and future plans.

Brilliantly, for the second and third rounds of the consultation, Crofton Park provided the highest number of responses across the whole network of 140 stations - beating Brighton, London Bridge and London Victoria in the 'having our say' stakes - a real tribute to Crofton Park power.

As a direct result: from May this year, we are getting FOUR TRAINS AN HOUR! This will effectively double our off peak services. In addition, we will also get two extra peak time services in the morning and two more in the evening, with scope for this to be increased in line with passenger needs in the future.

This is the culmination of years of work from the campaign, but as Michael mentioned, although we have achieved what the campaign set out to do, there are still a lot of hills to climb and we are willing to keep pushing for further improvements to the services and the station, as always, with your support.

Lewisham Council unveils new rail strategy

Lewisham Station in the 25th Century
Lewisham's leading technocrat, Cllr Alan Hall, has published Lewisham's new rail strategy on his blog. He explains:

“Railways are incredibly important to Lewisham and have shaped our local communities. I have said we must be ambitious for Lewisham but local residents need to be involved in our decisions. I have asked that this important report be discussed at the next Sustainable Development Committee but I would welcome public comments on these new and exciting plans.”

“These include increasing frequencies on existing routes, adding new stations and supporting the Bakerloo Line extension – dubbed Bakerlooisham”

The report highlights the dramatic differences in connectivity between the well-connected northwest of the borough (Greater Brockley) and the desultory southeast, where, for example, Whitefoot has no stations at all.

Lewisham Council's 'vision goals' are as follows:

1.To provide better links and sufficient rail capacity between all areas of Lewisham Borough and central London employment areas.
2. To provide sufficient rail capacity between all areas of Lewisham Borough and East London employment areas.
3. To increase rail access to and from Lewisham’s growth areas.
4. To improve rail connectivity across the Borough, especially east-west links and services to the south of the Borough.
5. To enhance the quality of stations and provide step-free access at all station in the Borough.
6. To improve the connectivity between stations and their local areas.

Which is a nice wish list but doesn't provide a great deal of focus. Loads of trains everywhere is not really a strategy. But there are some nice ideas, including:

- Providing 'Night Tube' style services on the DLR to Lewisham
- Extending the Croydon tram system in to the south of Lewisham
- The reopening of the high level platforms at Brockley for trains from Lewisham to Victoria, natch
- The Bakerloo extension to Lewisham to be extended as far as Hayes at the outset (rather than at some unspecified point in the future)
- An extension of the London Overground from New Cross to Lewisham Station
- A new southern entrance to Ladywell Station

The document also sets out the Council's position about the future of Lewisham Station, which will require a major redevelopment to accommodate the Bakerloo and rising passenger numbers:

Through the study [“Lewisham Feasibility Assessment: Station, Platforms and Subways”], the Council has advocated for improvements to Lewisham station to enable local housing development and provide access to Lewisham town centre. These upgrades should be a requirement on the new Southeastern franchisee in order to secure any possible increases in capacity before major schemes can be delivered. Better access to National Rail services and DLR could be secured through minor projects in the interim. 

The option to extend the Overground should be secured through any station upgrade project. With development sites coming forward at a rapid pace around the station, the opportunity exists now to start safeguarding a future vision for the station. This will ensure that the station in the future can engage with the surrounding area rather than be an inward-focused transit interchange.

To read the full document, click here.

Much of this stuff may be wishful thinking, but I am glad this thinking is going on.

Lewisham commuter rebellion as passengers abandon train during Storm Emma


Passengers held outside Lewisham Station on a Southeastern train rebelled and fled the train during Storm Emma tonight. The Telegraph reports:

"In south-east London commuters took matters into their own hands, pressing the emergency door release and getting out onto the tracks when their train was held outside the station. As a result, all lines through Lewisham station were blocked.

"Southeastern Railway said the situation was getting worse "because several people are jumping off trains onto the tracks", warning that it would only cause further delays.

"Power was switched off on trains because of the incident and the police and fire service were brought in to help get people off trains."

New London Bridge reopens on schedule

The new concourse (Photo: Network Rail)
The huge new London Bridge Station concourse opened as planned this morning, enabling passengers to switch platforms with ease.

It won't stop Southern arbitrarily cancelling evening trains to Brockley on a nightly basis, but you'll have somewhere epic to wait for the next one, with 70 new shops and restaurants due to open this year.
The new Tooley Street entrance (Photo: Team London Bridge)
The new concourse will also allow Cannon Street services to resume calling at London Bridge and provide much quicker access to Tooley Street.

Crofton Park train campaigners aim high

Michael from the Cinderella Line campaign group, which campaigns for better train services through Crofton Park, writes:

Thameslink have proposed to run four trains to Crofton Park every hour at the weekend, which is great, but they are suggesting we'll have to wait until December 2018. Bah! Humbug! We think that's way too long to wait.

In the last round of their consultation, Crofton Park had the highest number of responses, closely followed by Nunhead in third place, and Catford in fifth. Brighton came in sixth and given how much trouble they have had over the last year it just goes to show what a sweet sound our community makes when it comes to singing from the same carol sheet.

But we need to raise our voices one more time while the weekend services are within our grasp.

We have to respond by 20th December so please get your vote in now.

But they want even more! They continue:

A little while ago now, the Cinderella Line campaign and the local community successfully pushed for services into Victoria during morning peak times on a weekday. ​

That's helped curtail a lot of commutes but imagine if Southeastern trains on the Cinderella Line went to Victoria on a weekend too?

You can sign our petition for this change here.

Ladywell to Victoria trains from 2022

The excellent 853 blog reports that Blackheath's loss will be Ladywell's gain:

Blackheath, Kidbrooke and Eltham stations are set to lose their direct rail services to Victoria from December 2022, according to new documents issued by the Department for Transport today.
But Bexleyheath line passengers will be able to take twice as many trains from Lewisham to Victoria, lessening the pain for passengers who complained about the possibility of losing the link.

The current Victoria services will be switched to the Sidcup line, while half the trains that currently run from Hayes via Catford Bridge to Charing Cross will now run to Lewisham, Nunhead, Peckham Rye, Denmark Hill and Victoria.

This brings direct trains to Victoria from stations such as Hither Green, Lee, Mottingham and New Eltham; as well as Ladywell and Lower Sydenham.

Full details here.

With thanks to Joe for the spot.

Yule not enjoy the Christmas train service

Joe pointed me in the direction of this announcement about local trains over the Christmas period:

This Christmas, between Saturday 23 December and Monday 1 January 2018 inclusive, there will be closures and changes to services as the Thameslink Programme continues to rebuild London Bridge station and the surrounding railway.

During this time there will be fewer trains into London and your journey will take longer, especially during the three working days (27th -29th December) From Saturday 23 December until Monday 1 January 2018, there will be changes to rail services across London and the south-east while Network Rail continues to transform north-south travel through London as part of the Thameslink Programme.

Southeastern, Thameslink, Gatwick Express and Southern services will all be affected as well as other train operators, with no National Rail services running on Christmas Day or Boxing Day.

Southeastern services will not run to or from Cannon Street, Charing Cross, Waterloo East, London Bridge, Deptford, Greenwich, Maze Hill, Westcombe Park, New Cross and St Johns for the entire period of 23 December to 1 January.

Thameslink services will not run through central London. Trains will be terminating at Blackfriars, Victoria or London Bridge (from the south) and St Pancras International (from the north) from 23 December to 1 January.

A reduced Southern service will operate to and from London Bridge from 23 December to 1 January.

Cinderella Line meeting this saturday

The Cinderella Line group, which lobbies for better Crofton Park train services, writes:

We had amazing local support during Phase 1 of the Thameslink consultation where 2875 people from this area had their say.

But there’s more to come. Timetables are on the menu for Phase 2 of the consultation so this is your chance to ask questions.

What will we be getting? Where will it stop? When will it run? Want more Victoria services? This is our time to ask.

What we’ve achieved so far:

  • New Class 700 trains being rolled out, with 30% more capacity
  • 4 extra services to Victoria in the mornings, courtesy of Southeastern
  • 20% of the response to the whole of Phase 1 of the Thameslink consultation coming from Crofton Park

So come to the Rivoli Ballroom at 2pm on Saturday - let Thameslink hear our voices!

Details here.

DfT muses on Cannon Street, Victoria or Charing X-only service for South Eastern trains

Joe writes:

The DfT has launched a consultation about South East London train services and seems to be suggesting that the routes through Lewisham and Deptford might in future only terminate at Cannon Street although very little detail is given. The document says:

"There would be a limit to the improvements that could be made to the timetable without also reducing the number of central London stations served from certain locations at particular times. An example might be for all Metro services on the north Kent (between Dartford and Charlton), Greenwich and Bexleyheath lines to terminate at Cannon Street only.

"We believe that the simplicity of a regular service to a single London terminal throughout the day would benefit both regular and occasional passengers. A simpler service can help deliver a step-change improvement in the punctuality of both Metro and Mainline services. We are aware that losing direct connections to particular central London stations has the potential to inconvenience a number of passengers, by requiring them to change their usual journey patterns."

This obviously has some major issues if you don’t pay for the tube. It could significantly add to journey times travelling from Cannon Street to Victoria and put a lot more pressure on TfL There is aconsultation Sat 1st April 10:00-13:00 Lewisham Glass Mill Leisure Centre.

Thameslink works cause St John's headache

Martin writes:

We are having a nightmare in St. Johns with the ongoing railway work. Network Rail have converted the woodland area opposite the station into a works depot for the broader Thameslink project. They have done this without planning permission and consultation.

For those of us living around it, it has become a noisy sometimes 24 hour nightmare. What’s more, they seem to now be extending their depot by constructing new permanent buildings.

This photo shows the currently muddy works deport, complete with the foundations for new buildings that do not have planning permission despite needing it as we are in a conservation area.

Living with the has been difficult over several years and they have partly destroyed the woodland area that makes Cliff Terrace such a special street. We understand that the work has to take place and that it will ultimately benefit everyone, but we are tired of the every expanding, unpermitted work they are doing on our street.

What makes it even more difficult is that our local labour councillors seem to completely indifferent to the difficulties we are experiencing. We are a small community have been imploring them for years to help us, but they just talk about the issue and deliver nothing. They have been aware of the work since before it has started, and have been involved, but have proved completely ineffective in dealing with network rail.

This is a plea to our local councillor Sophie McGeever and Lewisham planning department to help address these problems. We want the work to stop and we want the area to be properly replanted.

The Guardian: Southern trains reach Union peace deal

The Guardian reports:

Southern rail is believed to have reached a deal with train drivers to end their dispute following a second week of talks.

The result of the negotiations held at the TUC between operating company Govia Thameslink Railway (GTR) and drivers’ union Aslef is expected to be announced later on Thursday.

A series of strikes by drivers had brought trains to a halt, while an overtime ban saw branch lines closed and services severely disrupted from early December until talks began.

Strikes planned for late January were suspended while Aslef started fresh talks to resolve the row over driver-only operated trains, which drivers said were potentially unsafe.

Hopefully this marks a return to the world class service for which Southern was previously known.

You shall go to Blackfriars - join the campaign for Crofton Park trains every 15 minutes

A Cinderella Line - it has a logo and everything
Local action groups aren't supposed to be this successful. The Cinderella Line is a campaign to improve the frequency and quality of services that run through Crofton Park Station.

They scored an impressive early win with the recent decision to offer more trains during morning rush hour. Now they want your help to do more. They say:

"We’re fighting for improvements on the Catford loop trains. Now is the time for action.

"Thameslink Railway are in the middle of the biggest timetable consultation in a generation and want our thoughts on their proposals. This is our chance to get four trains an hour as a minimum standard for Crofton Park and the Catford Loop. A chance to get trains every 15 minutes, so you can just turn up and go.

"But to get all of this we need your help. We need to get 1,500 responses by 8th December so we can show how much demand there is for our service.

"All you need to do to respond is sign your name and say you support our request for a minimum of 4 trains an hour, through Blackfriars, all day every day.

"You can of course add your own comments and suggestions too. Just click here to go to the response survey."

Major improvements to Crofton Park trains from December

The Cinderella Line is the campaign group working to secure better train services through Crofton Park. The current service is as infrequent as it is unreliable and they believe the people along that route deserve better.

The group has been working with Vicky Foxcroft MP and Southeastern Trains to introduce a new timetable and has had a stunning success. They say:

"From December 12th, four new trains will stop at Crofton Park between 7-9am . Three will go on to Denmark Hill and Victoria and one to Elephant & Castle and Blackfriars.

"The Victoria services currently pass through Crofton Park but don’t stop there, so they will now make the additional stop at Crofton Park.

"We have also been pushing Thameslink to introduce new Class 700 trains, with 30% more capacity than the trains we currently have. The first of these will appear from the end of November and then replace our current trains at the rate of one per week.

"These stations were chosen as they have the least number of trains on the Catford Loop. The services will be weekday mornings only – for the evening, people can change at Denmark Hill and the journey time will be 25 minutes from Victoria to Crofton Park.

"By January next year, all our peak time services should be the new trains which offer 30% extra capacity to the current ones."

Times for the new services are as follows:

07:36 Crofton Park – Victoria
07:58 Bellingham – Victoria
08:24 Crofton Park – Victoria
08:43 Crofton Park – Victoria
09:01 Crofton Park - Blackfriars

Follow the Cinderella Line team on Twitter here.

TfL plan to take control of South London trains includes new Brockley hub

TfL's vision for its expanded empire
Mayor Khan today presented the Secretary of State for Transport with the business case for the further devolution of London’s suburban rail services to Transport for London (TfL) and a plan, which includes a potential interchange between Brockley Station and the upper line which has been earmarked to reopen as part of a new orbital rail service.

The plan sets out how a better integrated and more reliable suburban rail network would improve services for millions of passengers, many of whom are being severely let down by suburban rail services out of stations like London Bridge and Waterloo.

The principle of the further devolution of suburban rail services has already been agreed by the Government in a joint DfT/TfL prospectus in January 2016. The business case presented today sets out how further Rail devolution would also deliver substantial economic benefits, supporting the development of 80,000 new homes while remaining cost neutral to central government.

The business case states how rail infrastructure in south London has been under-utilised, with low levels of capacity, poor service provision and increasingly crowded services. The case explains how, working closely with partners, TfL could apply its experience of successfully running the London Underground and London Overground networks to substantially improve travel for millions of rail passengers.

Improvements TfL believe they can deliver include:

• More frequent services, including increasing services longer term between Orpington and Victoria from 6 trains to 8 trains an hour, and trains from Bexleyheath to London from 7 trains to 9 trains per hour  
• Integrated fares and ticketing, with any freeze in TfL fares also being applied to devolved rail routes within London.
• Cleaner, refurbished and safer stations with all day staffing, turn up and go services for those with accessibility needs, and more reliable trains
• Installing more ticket gates, introducing Oyster and contactless payment where they’re not already available, and providing more or better ticket machines

The biggest impact of this would be in south London where house building rates are less than half the rest of London due to poorer transport connections.

The plan proposes the "provision of a new interchange facility at Brockley between Southeastern, Southern and London Overground services to enhance network flexibility and the additional journey opportunities this provides."

Mayor of London, Sadiq Khan said:
 
“For too long, London’s rail commuters have been getting a bad service – with nightmare delays, cancellations and overcrowding increasingly the norm on our suburban rail routes. Today’s business case sets out in detail the huge benefits Londoners will feel from devolving suburban rail routes to TfL. Our plans will not only use TfL’s skills and expertise to improve the daily commute for millions of Londoners, but act as a catalyst for new jobs and homes in outer London."

Southern proposes one fewer rush hour train from 2018

Southern Rail has published a consultation document regarding services from 2018, when the London Bridge upgrade is completed. The reward they're offering Brockley commuters for the years of disruption they have experienced is a reduction in service from 5 trains per hour during peak time to 4 trains per hour. All Brockley services will terminate at London Bridge.

The reduction in peak time capacity is likely to be offset by two more East London Line trains from 2018, but given that this route is already hugely overcrowded and usage has been growing fast, it would be a shame to lose an overland train.

The consultation states:

"Analysis has also revealed that passengers travelling from stations between Norwood

Junction and New Cross Gate in many cases travel beyond London Bridge to stations such as London Charing Cross, London Blackfriars and City Thameslink. Whilst this route ranked third in terms of passengers travelling to Thameslink stations, London Overground are expected to operate additional services to meet this demand. Introducing Thameslink trains on this route is not appropriate due to the direct interaction with other high frequency trains on the East London Line and a lack of suitable turnaround facilities. 

"Alternative high frequency Thameslink and Southeastern trains will be available at London Bridge where passengers will be able to easily interchange, for onward destinations, between trains using step-free access." 

On the up-side, there is also continued recognition that the Crofton Park service needs improvement, with the consultation noting:

"The Catford Loop line generates significant passenger demand but currently is only served by two trains per hour throughout the day. It is recognised that this route requires a more frequent service than is currently provided."

In 2021, TfL will take control of these routes and save us from Southern.

New London Bridge station opens, offering Charing X connection once more

Two thirds of the new concourse has been opened. Photo courtesy of Network Rail
The huge new concourse at London Bridge Station has been opened to commuters, allowing passengers to make connecting journeys to Charing Cross again.

The station is the fourth busiest in the country and has been undergoing a major transformation, which will increase capacity and allow passengers to connect to any train without having to navigate a rabbit warren.

The Evening Standard reports:

Over the bank holiday weekend the project's construction site was moved away from the Southern and future Thameslink platforms to focus on the north of the station, used by Southeastern.

Trains into Charing Cross have now begun calling at London Bridge for the first time since January 2015, but Cannon Street trains stopped serving the station on Friday and will not resume until January 2018 [when the station reopens fully].

The St John's Manifesto

Oliver Lewis writes:

'On Thursday 22nd September at 7.30pm the St. John's Society and Vicky Foxcroft MP are hosting a rail summit to tackle the Pandora's box of issues emanating from our rail service at present. Eg. the 8.03 service from St. John's was on time just 11% of time over the past three months; seldom a day goes by when there isn't something wrong.

All welcome - the venue is St. John's Church on St. John's Vale - and feel free to comment on our list of objectives below'

- Renewal of signage at the entrance to the station. This is within SouthEastern's powers to rectify.

- Installation of new and extra seating along the full length of the platform. This is within SouthEastern's powers to rectify.

- A revised time table that runs to schedule. This is unacceptable and we would like a public statement from the management of SouthEastern setting out their action plan, with SMART objectives, to address this performance and improve it by the end of the year. This is within SouthEastern's powers to rectify.

- Further information on the reasons why the station car park was closed abruptly and without consultation, and a guarantee from Network Rail that this asset will not be subject to sale or development. This is within NR's powers to rectify, but SouthEastern has been unimpressive in defending its passengers' interests.

- The reopening and restoration of the waiting room. This would require the enclosure of Network Rail equipment stored in the waiting room, and support and funding from SouthEastern. With consent from NR this is within both bodies' powers to rectify.

- Painting of both sides of the rail bridge above St. John's Vale. This is a Network Rail asset and is owned by them. Two years ago the then community affairs manager for NR advised the bridge was added to an asset repainting register. We have since learnt it has been removed from this. We would like to know why it was removed, when it will be put back, and have a binding pledge that the bridge will be repainted on both sides within 12 months. This is within NR's powers to rectify.

- Community adoption of land adjacent to station car park. This small patch of land is a terrific eyesore lining the main road through the conservation area; its fence is damaged, the land is used for fly-tipping and is overgrown with brambles. We would like to explore adopting the land, turning it into a shared space cared for and used by the community. This is within the powers of NR to rectify.

- Disabled access. This is a long term objective but we would expect a feasibility study to be undertaken at the earliest opportunity given the enormous increase in passengers using the station since 2010. This is within NR's powers to rectify.

No Brockley or Honor Oak train services today

Main line and East London Line services through Brockley Station are still disrupted following the emergence of a gaping 50 feet-deep hole beneath the tracks at Forest Hill yesterday.